Skip to product information
1 of 4

EBC BRAKES

EBC DP3528C Nissan Redstuff Rear Brake Pads - Sumitomo / Akebono Caliper

EBC DP3528C Nissan Redstuff Rear Brake Pads - Sumitomo / Akebono Caliper

Regular price $74.00
Regular price $77.00 Sale price $74.00
9th Anniversary Badge

Price Match

Notify Me When Available

In Stock

Receive your order by tomorrow if ordered within
00 hours
00 mins
00s.

Get It By

Receive your order tomorrow. Subject to availability.

Collect 0 points

Purchasing this product will earn you 0 loyalty points worth $0.00 USD.

Price Match Guarantee

If you find a lower price at an eligible UK retailer website, we will match it.

Fitting service at Xatrix, West Yorkshire

We can offer a fitting service for this part. Contact us for a fitting quote.

UNLOCK BIGGER DISCOUNTS WITH ML PLATINUM
Sign Up

Sign up now for FREE

View full details
  • Excellent type approved upgrade pad for prestige imports and European/Asian cars
  • Featuring Brake-In surface coating for instant bed-in after installation
  • Low dust pad which gives a brake improvement of 20-25% on OE
  • Minimal rotor damage characteristics
  • These pads contain NO steel fibers

Ceramic particles (not fibers) enhance the aramid fibre formulation used in EBC Brakes Redstuff to deliver powerful and long lasting silent braking for the discerning driver.

An ideal upgrade delivering great brake response and feel from first application of the brakes. Redstuff pads are NOT FOR TRACK USE. See Yellowstuff, Bluestuff, or the new RP1 and RPX full race pads for track use.

 

Pad A Dimensions : 85 x 43 x 14mm
R90 Approved : Yes
Track Suitable? : No

 

  • 1 set of pads for two calipers (2 pcs.)

 

Model Sub-Model Engine BHP Year Position
Silvia (S13) - 2.0 Turbo - 1991-1993 Rear
Silvia (S14) - 2.0 Turbo - 1993-1999 Rear
Silvia (S15) - 2.0 Turbo - 1999-2002 Rear
Skyline (R30) - 1.8 - 1981-1985 Rear
Skyline (R30) - 2 - 1981-1985 Rear
Skyline (R30) - 2.0 Turbo - 1981-1985 Rear
180SX - 2.0 Turbo 205 1991-1999 Rear
200SX S14 2.0 Turbo - 1994-2001 Rear
300ZX Z31 3.0 Turbo - 1987-1989 Rear
180 SX S13 2.0 Turbo - 1991-1999 Rear
200 SX S13 2.0 Turbo - 1991-1994 Rear
200 SX S14 2.0 Turbo - 1994-1998 Rear
200 SX S15 2.0 Turbo - 1994-2004 Rear
300 ZX Z31 3.0 Turbo - 1986-1989 Rear
Silvia S14 2.0 Turbo - 1993-1999 Rear
Silvia S15 2.0 Turbo - 1998-2004 Rear
Skyline R30 FJ20DET 2.0 Turbo - 1983-1985 Rear

 

To ensure the part(s) you have ordered fits your vehicle, we run a compatibility check prior to dispatch. We can do this either using your registration number (UK) or the last 7 digits of your VIN. Simply enter your car details prior to checkout.

 

EBC-DP3528C

 

Manufactured by

EBC Brakes

 

EAN

5039221035282

 

Warranty

EBC one year or 10,000 miles warranty

  • Price Match Guarantee

    We are committed to giving you the best price. if you find a lower price on the same item at an eligible UK retailer website, we will match it.

  • Next Day UK Delivery

    For in-stock item, get guaranteed next day UK delivery. Same day dispatch available on in-stock items if your order is placed before 1pm UK Time.

  • Worldwide Shipping

    We ship worldwide via DHL International, simply enter your full address at checkout to see the shipping option(s) and quote(s). Same day dispatch available if your order is placed before 1pm UK Time on all in stock items!